Tuesday, 15 May 2012

Production Meeting Reflection 3

This week I finished Timmed running order and made copies so that all of the crew had a rough idea of what was going on at what time during the programme. I also helped to finalise the set layout and let Graphics know what would be needed.

  • I found that once I had finished the Timed running order  was displeased with the final result so I went back and tweaked the positioning of some of the segments. I was pleased that I was able to work closely with Set Design to get the layout finished quickly which enabled us to move on to other issues.
  • In the coming week I am planning to start the Camera Script which details every camera shot that takes place throughout the show as well as any pre-recorded content and VT's. I will also have to include what the set will look like, the positioning of the cameras and what graphics will be needed in each shot. I will also help to finalise the props list working with the floor manager and set design, this will let me plan what equipment needs to be collected when and from what department/ area of the school.
  • This week I will have to work closely with the floor manager to finalise the props and set layout, I will also have to liaise with graphics to sort out any problems that may occur due to changes in the script and timming of each segment.

No comments:

Post a Comment