Wednesday, 23 May 2012

Production Meeting Reflection 4

This week I finished my Camera Script and put it in the shared folder so that the others could use it as a base for their own role specific camera scripts. As there are a lot of shots involved with filming a 30 minute programme this took me longer than I had anticipated, and Miss Bains gave me some improvements that I could make on the draft that I sent her such as colour coding the three different cameras used and giving some more detail in the Segment Description column. 


  • This week I need to work closely with Billy as he will be creating his cue list based on my Camera Script and specific lines from the Dialogue Script that Shriya and Morgan created. I will also have to make sue that Keren has produced graphics that match the questions being asked and that she has them in the correct order. I will also have to work with Mahdi on getting his cues for the sound effects and Raees about securing the props we need and when we will be able to get them up and into the studio.
  • I feel that I will need to work on being confident with my cuts and communicating with the people in the Gallery as well as relaying as much information to Raees via the mic system so that he can have better control over the set.
  • My main fear about next week is that I will not perform well in the role of director, meaning I will make bad decisions about when to cut the camera feed and I will not be able to keep a level of control over what camera positions I feel would look best as well as relaying instructions to Raees.

1 comment: